We are making progress. If the weather cooperates, new
counters will be installed this weekend. Why is the weather a factor? The entrance
to the studio, which once was a garage below our 1930-something home, has a
significant slope. It has been covered with snow and ice for the past two
weeks, until I was able to scrape in clean yesterday. This is the only way to
get large items (like the cabinet below and the 6 and10-ft counter tops into
the studio.) As I write this post, there is a steady downpour of rain which is
predicted to turn into ice and up to 8-inches of snow. My optimistic friends
assure me this accumulation will melt in a day or two. Fingers are crossed!
About this cabinet;
I asked HR to build something to hold my portfolios and
large drawing pads and with a shelf to store my drawing box. This is what he
came up with; a 72-inch cabinet with four shelves, three are adjustable. His
rationale; “I knew you would want more storage space and I would just as soon
build it now than later.” Does this man know me or what?








